Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

Feasibility Study / Corrective Measures Study

Correspondence
  Publication
Date
File Size
DTSC Approval of the NASA Baseline Vapor Sampling for the Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study June 2024 105 KB
DTSC Second Round of Responses to DOE’s Responses Regarding the 2020 Groundwater Corrective Measures Study September 2023 776 KB
DTSC Approval Email for the Bravo Area Bedrock Vapor Extraction Data Gap Work Plan August 2023 32 KB
DOE Responses to LARWQCB and DTSC Comments on Draft Groundwater CMS May 2023 544 KB
DTSC Comments on RCRA Limited CMS Workplan Addendum, Surficial Media Operable Unit, for Boeing RFI Subareas May 2023 325 KB
DTSC/RWQCB Responses to DOE’s Responses to DTSC and RWQCB Comments on the DOE Groundwater Corrective Measures Study April 2023 436 KB
DTSC Response to NASA RTCs on the Groundwater CMS Remedy Implementation Program Investigation Report, Former LOX Plant Bedrock Vapor Data Gap Investigation March 2023 226 KB
DTSC Approval Letter for NASA’s Coca Plume Data Gap Well Installation Workplan March 2023 368 KB
NASA RTCs on the Groundwater CMS Remedy Implementation Program Investigation Report, Former LOX Plant Bedrock Vapor Data Gap Investigation February 2023 330 KB
DOE Response to DTSC and RWQCB Comments on Groundwater CMS January 2023 580 KB
DOE Response to DTSC and RWQCB Comments on Groundwater CMS_ December 2022 350 KB
DTSC Comments on Boeing's CTL-III C-33 Scope of Work and BVE Work Plan October 2022 334 KB
Letter form Michael Bower, Boeing to Grant Cope, DTSC regarding DTSC’s November 19, 2019 Directive Regarding Groundwater Corrective Measures Studies and Risk Assessments at SSFL January 2021 115 KB
Enhanced In Situ Bioremediation (EISB) Pilot Study Work Plan Approval Letter September 2020 153 KB
Letter from David Dassler, Boeing to Director Meredith Williams, DTSC responding to DTSC letter dated Nov 19 2019 regarding Groundwater Corrective Measures Studies and Risk Assessments December 2019 189 KB
DTSC Comments for CMS GW Risk Assessment Goals November 2019 122 KB
Area IV Bedrock Investigation HMSA - Work Plan Addendum April 2018 1.1 MB
Area IV Bedrock Investigation FSDF – Work Plan Addendum April 2018 1.0 MB
Area IV Groundwater Source Investigations - Work Plan Addendum April 2018 2.7 MB
Technical Memorandum - FSDF Source Investigation - Soil Gas Sampling Progress Report - February 27, 2018 February 2018 2.2 MB
DTSC Letter re: Feasibility Study Work Plan June 2013 887 KB
Letter and Letter of Transmittal from Thomas Gallacher/Boeing to Norman Riley/DTSC Regarding Feasibility Study Work Plan April 2009 April 2009 121 KB
^Top^