Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

Feasibility Study / Corrective Measures Study

Workplan
  Publication
Date
File Size
DTSC Comments on the NASA Former LOX Plant Area Bedrock Vaper Extraction Pilot Study Workplan October 2023 247 KB
NASA Bravo Area Bedrock Vapor Extraction Data Gap Work Plan to Support Phase 1 Corrective Measures Design and Implementation Activities August 2023 16.4 MB
DTSC Approval Letter of the Boeing RCRA Limited Corrective Measures Study Work Plan Addendum August 2023 186 KB
NASA Baseline Vapor Sampling for the Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study April 2023 15.9 MB
NASA Installation of Vapor Extraction Well NV-003 and Vapor Monitoring Wells NV-004 and NV-005 Technical Memorandum March 2023 19.5 MB
Coca Plume Monitored Natural Attenuation Data Gap Well Installation Work Plan to Support Phase 1 Corrective Measures Design and Implementation Activities February 2023 24.5 MB
RCRA Limited CMS Workplan Addendum, Surficial Media Operable Unit, for Boeing RFI Subareas February 2023 4.8 MB
2023.01.27_DTSC Approval Letter for Boeings Final BVE Work Plan January 2023 170 KB
DTSC Approval Letter for the Boeing Final Soil Vapor Extraction Pilot Study Work Plan, IEL January 2023 198 KB
Boeing Final Soil Vapor Extraction Pilot Study Work Plan, Instrument and Equipment Laboratory (IEL) December 2022 25.1 MB
Boeing CTL-III Bedrock Vapor Extraction Pilot Study Work Plan September 2022 22.5 MB
NASA RTC on Alfa Well Installation Work Plan to Support Corrective Measure Design June 2022 204 KB
DTSC Approval Letter of NASA Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study Work Plan March 2022 123 KB
NASA Alfa Area Bedrock Vapor Extraction (BVE) Pilot Study Work Plan January 2022 32.4 MB
NASA CMS Delta Area Well Installation Workplan February 2021 8.6 MB
Area IV Groundwater Corrective Measures Study Work Plan February 2018 4.3 MB
NASA Feasibility Study Work Plan Addenda September 2017 224 KB
Boeing CMS Work Plan Addendum for Vadose-Zone Bedrock and Groundwater Areas August 2017 20.5 MB
Feasibility Study Workplan April 2009 28.3 MB
^Top^