Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

Feasibility Study / Corrective Measures Study

Groundwater Modeling
  Publication
Date
File Size
DTSC Approval Letter for the Boeing Area I: Northeast Cut-out Flow Modelling Uncertainty Analysis February 2023 231 KB
DTSC Approval Letter for the Boeing Final Bedrock Vapor Extraction Pilot Study Work Plan, CTL-III January 2023 166 KB
Boeing Area I: Northeast Cut-out Flow Modelling Uncertainty Analysis January 2023 13.9 MB
DTSC Conditional Approval of Boeing Mountain Scale Groundwater Flow Model (MSGFM) December 2022 507 KB
Hazardous Materials Storage Area Flow and Transport Modeling December 2020 6.5 MB
Supplemental Model of Back Diffusion with Transient Flow and Vadose Zone – Former Sodium Disposal Facility December 2020 1.7 MB
Groundwater Transport Modeling to Investigate Contaminant Back-Diffusion from the Rock Matrix, Radioactive Materials Handling Facility December 2020 3.2 MB
^Top^