Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

Permit-related Activities

Areas I, II, and III Surface Impoundment Post-Closure Permits (2014 and prior)
  Publication
Date
File Size
Letter from Art Lenox/Boeing to Mark Malinowski/DTSC Regarding Confirmed Verification Sampling and Analysis Results: Proposed New Constituents of Concern - Post-Closure Permit No. PC-94/95-3-02 September 2011 538 KB
Post-Closure Permit - Attachment A Modification - Area I and Area III July 2011 1.6 MB
Post-Closure Permit - Attachment A Modification - Area II July 2011 1.5 MB
Post-Closure Permit - Attachment B Modification - Area I and Area III July 2011 981 KB
Post-Closure Permit - Attachment B Modification - Area II July 2011 983 KB
Letter from Art Lenox/Boeing to Rick Brausch/DTSC Regarding Confirmed Verification Sampling and Analysis Results Proposed New Constituents of Concern - Post Closure Permit Nos. PC-94/95-3-02 and PC-94/95-3-03 April 2011 758 KB
Letter from Art Lenox/Boeing to Rick Brausch/DTSC Regarding Confirmed Verification Sampling and Analysis Results Proposed New Constituents of Concern - Post Closure Permit Nos. PC-94/95-3-02 and PC-94/95-3-03 February 2011 660 KB
Permit Conditions - Hazardous Waste Facility Post-Closure Permit - Area I and III January 2010 577 KB
Permit Conditions - Hazardous Waste Facility Post-Closure Permit - Area II January 2010 541 KB
Post Closure Permit for NASA/Boeing Company: Santa Susana Field Laboratory - Area II November 2001 6.6 MB
Post Closure Permit for the Boeing Company: Rocketdyne Propulsion and Power - Santa Susana Field Laboratory - Areas I and III November 2001 7.2 MB
Memorandum from Craig Christmann/DTSC to Odette Madriago/DTSC Regarding Clarification to the March 5, 1996, Memorandum Regarding the Petition for Review on the Hazardous Waste Facilities for Boeing-North American/Rocketdyne Division Post-Closure Permit (Areas I and III) and NASA/Boeing-North American/Rocketdyne Division Post-Closure Permit (Area II) March 1997 80 KB
Memorandum from Julio Narvaez/DTSC to Odetto Madriago/DTSC Regarding Recommendation to Grant in Part and Deny in Part the Petition for Review on the Hazradous Waste Facilities for Rockwell International Corporation, Rocketdyne Division Post-Closure Permit Area I and III and NASA Post Closure Permit Area II - Both Dated May 11, 1995 March 1996 387 KB
Letter from R.Y. Ueshiro/Rockwell Aerospace - Rocketdyne to Jose Kou and Ted Rauh/DTSC Regarding Petition for Review, NASA and Rocketdyne Post-Closure Permits - SSFL May 1995 307 KB
^Top^