Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

RCRA Facility Investigation - Groundwater

Faults
  Publication
Date
File Size
DTSC Comments on the Hydrogeologic Characterization of Faults Report October 2019 3.1 MB
Site-Wide Faults Map Update August 2017 1.5 MB
Draft Hydrogeologic Characterization of SSFL Faults, Appendices November 2016 206.9 MB
Draft Hydrogeologic Characterization of SSFL Faults, Main text, tables, and figures November 2016 43.9 MB
Fault Characterization Work Plan Approval letter March 2013 550 KB
Letter from Roger Paulson, DTSC to Michael Bower, Boeing re: Comments on the Draft Technical Memorandum "Implementation of the Happy Valley Fault Pumping Test" September 2012 2.7 MB
^Top^