Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

RCRA Facility Investigation – Soils

Group 5
Group 5 RFI Report Publication
Date
File Size
Group 5 RFI Report - Document Index November 2008 18 KB

Group 5 Historical Documents Publication
Date
File Size
Group 5 RFI Report Reference - Document Index November 2008 179 KB
Group 5 Specific - Document Index November 2008 41.0 MB

Group 5 Related Reports Publication
Date
File Size
Letter from Roger Paulson/DTSC to Michael Bower/Boeing re: Soil Sampling at the B-1 Site November 2012 574 KB
Letter from Michael Bower/Boeing to Roger Paulson/DTSC re: Soil Sampling at the STl IV RFI Site November 2012 2.0 MB

Group 5 Agency Review Comments Publication
Date
File Size
DTSC Human Health Risk Assessment Group 5 February 2012 2.2 MB
DTSC Human Health Risk Assessment Comments on Draft Group 5 RCRA Facility Investigation Report, Boeing, SSFL February 2012 2.4 MB
Cover Letter from Mark Malinowski to Tom Gallacher Regarding Transmittal of Group 5 RCRA Facility Investigation Report.pdf June 2010 418 KB
Memorandum from Brian Faulkner/DTSC to Gerard Abrams/DTSC Regarding Partial Review of the Group 5 RFI Report May 2010 8.4 MB
Memoradum from Thomas Seckington/DTSC to Gerard Abrams/DTSC Regarding Group 5 RFI Report January 2010 1.1 MB
Memorandum from Laura Rainey/DTSC to Gerard Abrams/DTSC Regarding Group 5 Central Portion of Areas III and IV December 2009 633 KB

Group 5 Community Comments Publication
Date
File Size
Letter from Christina Walsh/cleanuprocketdyne.org to Laura Rainey/DTSC Regarding RCRA Group 5 SSFL - Comments for Santa Susana Field Laboratory Areas III and IV as Defined within the RCRA Group Guidelines May 2009 5.6 MB
Public Comments on the Group 5 RFI Report - Volume 1 May 2009 2.9 MB
Public Comments on the Group 5 RFI Report - Volume 2 May 2009 9.2 MB
Public Comments on the Group 5 RFI Report - Volume 3 May 2009 5.3 MB
Letter from Christina Walsh/cleanuprocketdyne.org to Laura Rainey/DTSC Regarding RCRA Group 5 Preliminary Comments for Santa Susana Field Laboratory Areas III and IV as Defined within the RCRA Group Guidelines April 2009 6.8 MB

Group 5 Correspondence Publication
Date
File Size
Letter from Gerard Abrams/DTSC to Adam Boettner/Boeing Group 5 RCRA Facility Investigation (RFI) Report Hardcopy Submittals November 2008 149 KB
Letter from Thomas Gallacher/Boeing to Norman Riley/DTSC re: Submittal of Documents Containing Confidental Business Information Groups 5 and 10 RFI Reports November 2008 105 KB
Letter from Thomas Gallacher/Boeing to Norman Riley/DTSC Regarding Submittal of RFI Report for Group 5 Reporting Area November 2008 137 KB

^Top^