Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

RCRA Facility Investigation – Soils

Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area
Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area Publication
Date
File Size
DTSC Conditional Approval of the Boeing Company’s RCRA Facility Investigation DSFR for the Former Shooting Range from Grant Cope to Michael Bower October 2022 169 KB
Revised Draft Shooting Range Data Summary and Findings Report (excludes Appendix I) October 2018 43.6 MB
Revised Draft Shooting Range Data Summary and Findings Report, Appendix I – Field Documentation Logs October 2018 758.6 MB
Letter from Julie Lincoln, DTSC to Mike Bower, Boeing Regarding Approval of the Shooting Range Work Plan Addendum May 2018 2.7 MB
Cover Letter May 2018 419 KB
Responses to DTSC Comments on the Former Shooting Range Work Plan Addendum May 2018 1.1 MB
Former Shooting Range Work Plan Addendum – Main text, tables, and figures May 2018 7.1 MB
Former Shooting Range Work Plan Addendum – Appendix A – Soil and Sediment Lead Sampling Data May 2018 58 KB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report May 2018 8.3 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix A: 2016/2017 Reporting Year Sampling and Analysis Plan May 2018 6.2 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix B: 2016/2017 BMP Program Laboratory Reports May 2018 394.6 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix C: 2016/2017 BMP Subarea Prioritization Analysis May 2018 73.2 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix D: 2016/2017 BMP Performance Analysis May 2018 7.2 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix E: Outfall 008 Stormwater Background Evaluation May 2018 2.5 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix F: Comparisons of Outfall 008 Data and Other Land Use Data and Background Conditions May 2018 2.5 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix G: Area I Former Shooting Range (NPDES Outfall 009 Watershed) Memorandum May 2018 4.1 MB
DTSC Cover Letter and Comments on the Former Shooting Range Work Plan Addendum April 2018 5.4 MB
Former Shooting Range Work Plan Addendum – Appendix A – Soil and Sediment Lead Sampling Data February 2018 1.1 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report February 2018 8.2 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix A: 2016/2017 Reporting Year Sampling and Analysis Plan February 2018 6.0 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix B: 2016/2017 BMP Program Laboratory Reports February 2018 391.6 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix C: 2016/2017 BMP Subarea Prioritization Analysis February 2018 73.2 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix D: 2016/2017 BMP Performance Analysis February 2018 7.1 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix E: Outfall 008 Stormwater Background Evaluation February 2018 2.5 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix F: Comparisons of Outfall 008 Data and Other Land Use Data and Background Conditions February 2018 2.4 MB
Former Shooting Range Work Plan Addendum – Attachment 1 – 2016/2017 Site-wide Annual Stormwater Report – Appendix G: Area I Former Shooting Range (NPDES Outfall 009 Watershed) Memorandum February 2018 4.0 MB
Former Shooting Range Work Plan Addendum – Main text, tables, and figures February 2018 8.2 MB
DTSC Letter regarding Additional Characterization of Contaminant Migration at the Former Rocketdyne Shooting Range November 2017 2.3 MB
DTSC Cover Letter and Comments on the Draft Former Shooting Range Area DSFR May 2017 2.8 MB
Draft Shooting Range DSFR April 2017 2,059.4 MB
DTSC Approval letter for the Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area Investigation Work Plan Addendum November 2016 485 KB
Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area Investigation Work Plan Addendum November 2016 5.8 MB
DTSC Approval letter for the Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area Investigation Work Plan September 2016 569 KB
Former Rocketdyne-Atomics International Rifle and Pistol Club Shooting Range Area Investigation Work Plan August 2016 5.5 MB

Final RFI Reports Publication
Date
File Size
DTSC Conditional Approval of Final RCRA Facility Investigation Data Summary and Findings Report – Shooting Range October 2021 169 KB
Final Shooting Range Data Summary and Findings Report (excludes Appendix I) October 2020 43.0 MB
Final Shooting Range Data Summary and Findings Report, Appendix I – Field Documentation Logs October 2020 758.9 MB

^Top^