Back to Home Page
Department of Toxic Substances Control 
Home Site Map Contact Us
 
 

RCRA Facility Investigation – Soils

Boeing Subarea 1B Southeast
Data Gap Work Plan Addenda Publication
Date
File Size
1B Subareas Vapor Intrusion Assessment Technical Memorandum approval letter May 2015 543 KB
Vapor Intrusion Assessment Technical Memorandum 1B Southeast April 2015 1.7 MB
DTSC Letter of Approval of the Air Dispersion Evaluation Approach for the Component Test Laboratory III RFI Site November 2014 276 KB
Air Dispersion Evaluation for the Component Test Laboratory III Technical Memorandum November 2014 1.9 MB
DTSC Letter of Approval of the Second Iteration Addenda to the Master RFI Data Gap Work Plan for Subarea 1B Southeast:Component Test Laboratory III RFI Site and Perimeter Pond RFI Site September 2014 385 KB
Addendum to Master RCRA Facility Investigation Data Gap Work Plan - Iteration 2 - CTL-III August 2014 12.4 MB
Addendum to Master RCRA Facility Investigation Data Gap Work Plan - Iteration 2 - Perimeter Pond August 2014 563 KB
DTSC approval of Boeing RFI Data Gap Work Plan for Subareas 1B North and 1B Southeast November 2013 523 KB
Master RFI Data Gap Work Plan Addendum - CTL - III October 2013 10.3 MB
Master RFI Data Gap Work Plan Addendum - Perimeter Pond October 2013 9.5 MB
Master RFI Data Gap Work Plan Addendum - Unaffiliated Areas of 1B Southeast October 2013 1.8 MB

Draft RFI Reports Publication
Date
File Size
DTSC Comments on the Vadose Zone Evaluations for Sites Located in 1B Southeast October 2020 318 KB
DTSC Comments on the Boeing Company’s RCRA Facility Investigation Data Summary and Findings Reports for RFI Subarea 1B Southeast, SSFL, Ventura County, California July 2020 1.8 MB
Addendum to Appendix C: Potential Transport of Contaminants in Vadose Zone to Groundwater, Component Test Laboratory III RFI Site, SSFL, Ventura County June 2020 5.6 MB
Addendum to Appendix C: Potential Transport of Contaminants in Vadose Zone to Groundwater, Perimeter Pond RFI Site, SSFL, Ventura County June 2020 5.7 MB
RCRA Facility Investigation Data Summary and Findings Report - Cover Letter September 2017 515 KB
RCRA Facility Investigation Data Summary and Findings Report -Subarea 1B Southeast September 2017 74.6 MB
RCRA Facility Investigation Data Summary and Findings Report – Component Test Laboratory III September 2017 42.3 MB
RCRA Facility Investigation Data Summary and Findings Report – Perimeter Pond September 2017 13.0 MB
RCRA Facility Investigation Data Summary and Findings Report - Unaffiliated Areas of Subarea 1B Southeast September 2017 3.4 MB

Final RFI Reports Publication
Date
File Size
DTSC Conditional Approval of Final RCRA Facility Investigation Data Summary and Findings Report – 1B Southeast October 2021 191 KB
Cover Letter, Final RCRA Facility Investigation Data Summary and Findings Report, Boeing RFI Subarea 1B Southeast, SSFL, Ventura County October 2020 466 KB
Final RCRA Facility Investigation Data Summary and Findings Report, Boeing RFI Subarea 1B Southeast, Areas Unaffiliated with RFI Sites, SSFL, Ventura County October 2020 3.6 MB
Final RCRA Facility Investigation Data Summary and Findings Report, Boeing RFI Subarea 1B Southeast, Component Test Laboratory III RFI Site, SSFL, Ventura County October 2020 41.9 MB
Final RCRA Facility Investigation Data Summary and Findings Report, Boeing RFI Subarea 1B Southeast, Perimeter Pond RFI Site, SSFL, Ventura County October 2020 13.6 MB
Final RCRA Facility Investigation Data Summary and Findings Report, Boeing RFI Subarea 1B Southeast, SSFL, Ventura County October 2020 85.4 MB

^Top^